This is kinda our first year in De Búrca in photos – it looks like it happened all in one week. But it happened over nights and weekends and two days closed for business in October. It was a mad year. We’re happy it happened and we’re happy it’s over! Settling in now. Thanks to everyone that helped us.
- Front of McHale’s – April 2014
- Front of McHale’s – April 2014
- Back of McHale’s- April 2014
- McHale’s – April 2014
- McHale’s – April 2014
- McHale’s – April 2014
- McHale’s – April 2014
- McHale’s – April 2014
- McHale’s – April 2014
- McHale’s – April 2014
- McHale’s – April 2014
- Start of the lease!
- Start of the lease!
- Start of the lease!
- Start of the lease!
- Raising of the floor
- Raising of the floor
- Raising of the floor
- Raising of the floor
- Raising of the floor
- Building the partition wall
- The building inspector
- Heiton Buckley’s had lollipops for these two! Sound lads there.
- PVC wall going up in prep area.
- PVC wall going up in prep area.
- Doreen from Fernhill Stone told us about a paint that could be applied to tiles that would allow you to tile over – we are forever grateful!
- Getting ready for bricks!
- Finished wall!
- Our tearoom is finished!
- The mural from the early 1900s is cleared as much as possible. Beautiful.
- Off-white Metro tiles with dark grout going up – thanks Pat Langan.
- Off-white Metro tiles with dark grout going up – thanks Pat Langan.
- Shop coming on!
- Girls keeping an eye on Martin our painter.
- Shop front changing – July 2014
- Shop front changing – July 2014
- Awning up – Jim from Rilox was brilliant!
- Looking like how we wanted it!
- Rachel and Elly in the early morning before Delia was born.
- Beautiful Rachel.
- Sadhbh
- Delia
- Pat Langan (our tiler!) put up a temporary shelter for Rachel to finish her work so she would’nt get wet. A gent.
- Sadhbh and Delia.
- Delia.
- The old block from the shop being aired before cleaning, sanding and oiling.
- The only two days we were closed – to replace the shop front, change the counters, and lay the floor.
- Front off.
- Removing the front.
- Removing the front
- Moving the fridges
- Moving the fridges
- The ‘telephone box’ is leaving!
- The headless child of prague.
- label under the child of prague.
- Moving the fridges
- The front arriving from Geraghty’s Joinery in Galway. Beautiful work.
- Front going in – October 2014
- Front going in – October 2014
- Front going in – October 2014
- Our floor tile – Peronda
- Love the floor.
- Martin painting our front before the launch in 1 week! October 2014
- Getting ready to open for business next day.
- Getting ready to open for business next day
- Damien Moran’s beautiful sign writing.
- Damien Moran’s beautiful sign writing.
- Damien Moran’s beautiful sign writing.
- Damien Moran’s beautiful sign writing.
- Damien Moran’s beautiful sign writing.
- Damien Moran’s beautiful sign writing.
- Damien Moran’s beautiful sign writing.
- Damien Moran’s beautiful sign writing.
- Adding more to the inside – our notice board.
- Getting the inside in shape.
- McKenna Guides award – December 2014! Proud moment.
- Shop taking shape for Christmas.
- Sarah & Seán Christmas eve when the last customer left.
- April 2015
- April 2015
- April 2015
- Sadhbh & Elly 1 year later – April 2015